Wokefield Park, Reading

The Client

Elements Europe has delivered for leading conference and events company Principal Hayley at De Vere’s historic Wokefield Park Hotel in Reading.

In 2015, part of the hotel was devastated by a fire which saw the hotel lose 100 rooms. Elements Europe worked with Wates Construction, to deliver a new 95 bedroom section of hotel to replace what was lost in the fire.

Project Description: 95 Room Modules

Elements Europe manufactured the 95 Room Modules, as well as all corridor cassettes, plant, linen, cleaning and IT room, bringing the total number of modules to 117. All modules were installed to the main contractor’s schedule of works.

The building is three storeys high and features a mansard roof, something Elements Europe are used to manufacturing for, having done so on a number of projects.

Elements Europe’s procurement team worked closely with the hotel to ensure that the interior is to the hotel’s exacting standards and is an exact reflection of the aesthetics of their brand. Two types of Room Modules were manufactured, a standard and large room.

  • Sector:

    Hotels

  • Client:

    Principal Hayley

  • Architect:

    Synergy Architects