Middlewood Locks, Salford

The Client

Elements Europe was contracted by BCEGI, an international contractor, to deliver 914 Bathroom Pods to phase one of a £700 million residential development in Salford in 2017.

Elements Europe was then contracted to deliver a further 884 pods to Phase two.

Project Description: 914 Bathroom Pods (Phase One) | 884 Bathroom Pods (Phase Two)

Nine varying types of Bathroom Pods were manufactured for both phases. Pods varied in size and included; main bathrooms, en-suites, Jack and Jill bathrooms.

Phase one bathroom pods were delivered and installed across 6 blocks of apartments. Phase two saw 884 pods installed into four blocks ranging from eight to eleven storeys high.

Elements Europe’s design team worked closely with WCEC Architects to achieve the varying and detailed specification. All of the bathrooms are finished to a high standard featuring luxury brands such as Hansgrohe, reflecting the quality of the apartments.

In total, Elements Europe manufactured, delivered and installed a total of 1,798 bathroom pods to this new development.

 

  • Sector:

    Residential

  • Client:

    BCEGI

  • Architect:

    WCEC